Krueger Electric has supported a rising interest in renewable energy production over the last few years. Rising electricity cost has made switching over to other energy sources more attractive. Solar PV Installations are relatively quick and maintenance-free.
This project required installation of a 10kw commercial solar array at 1027 Trench Place in Kelowna.
There are 3 steps to installing a system:
- Systems Design – We will do a free site assessment and design a system that meets the customer’s needs.
- Installation – Typically only takes 2-5 days.
- Monitoring & System turnover – We set up each customer with app-based monitoring so that each customer can track system performance in real-time.